Port energy demand model for implementing onshore power supply and alternative fuels

Küçük Resim Yok

Tarih

2024

Dergi Başlığı

Dergi ISSN

Cilt Başlığı

Yayıncı

Pergamon-Elsevier Science Ltd

Erişim Hakkı

info:eu-repo/semantics/closedAccess

Özet

A feasibility study was conducted on the energy and peak power demand of ships for utilising the Onshore Power Supply (OPS) and transitioning to using alternative fuels. The port of Plymouth was adopted as a case study. Four types of ships, Ro-Pax, Tanker, Bulk Carrier and General Cargo, were in operation at the port. A representative vessel was selected for each ship type to simulate the average ship's cargo capacity and engine power. One year of real port operations, including material handling equipment and trucks, were simulated. The peak power and annual energy demand for the OPS system were calculated to be 5.95 MW and 7.1 GWh, respectively. Implementing an OPS system saved 83.6% of total CO2. Fuel volumes were calculated for conventional and alternative fuels, the volume of liquid hydrogen was around 3.5 times that of the conventional fuel, whereas methanol required less mass and volume than ammonia and hydrogen.

Açıklama

Anahtar Kelimeler

Maritime decarbonisation, Real port and ship data, ARENA simulation, Alternative fuels, Onshore Power Supply, Greenhouse emissions

Kaynak

Transportation Research Part D-Transport and Environment

WoS Q Değeri

Q1

Scopus Q Değeri

Q1

Cilt

136

Sayı

Künye