Assembly Line Worker Assignment and Balancing Problem by Considering Labor Cost

dc.contributor.authorYılmaz, Hamid
dc.date.accessioned2026-02-08T15:04:49Z
dc.date.available2026-02-08T15:04:49Z
dc.date.issued2022
dc.departmentBursa Teknik Üniversitesi
dc.description.abstractAssignment of worker appears as a new problem in the literature for assembly lines (AL) where the workforce is heterogeneously located. The difference of this line balancing from the traditional line is that the assembly task times of the workers to be assigned to the stations differ from each other. Especially assembly lines issues are generally a labor-intensive type of production. Therefore, for assembly line problems, balancing activity should be done considering the labor costs. Thus, the proposed solutions will be able to produce more realistic results for real life. For this purpose, in this study, a mixed-integer mathematical formulation is presented for assembly line worker assignment and balancing problems by considering the objective function of minimizing labor costs and cycle time. The efficiency of the proposed model and the improvements have been demonstrated by solving test instances in the literature.
dc.identifier.doi10.38088/jise.902395
dc.identifier.endpage31
dc.identifier.issn2602-4217
dc.identifier.issue1
dc.identifier.startpage22
dc.identifier.urihttps://doi.org/10.38088/jise.902395
dc.identifier.urihttps://hdl.handle.net/20.500.12885/4215
dc.identifier.volume6
dc.language.isoen
dc.publisherBursa Teknik Üniversitesi
dc.relation.ispartofJournal of Innovative Science and Engineering
dc.relation.publicationcategoryMakale - Ulusal Hakemli Dergi - Kurum Öğretim Elemanı
dc.rightsinfo:eu-repo/semantics/openAccess
dc.snmzKA_DergiPark_20260207
dc.subjectEngineering
dc.subjectMühendislik
dc.titleAssembly Line Worker Assignment and Balancing Problem by Considering Labor Cost
dc.typeArticle

Dosyalar