Yarding pre-bunched stems in thinning operations: Estimates on time consumption

dc.authorid0000-0001-6558-9029en_US
dc.contributor.authorMunteanu, C.
dc.contributor.authorIgnea, G.
dc.contributor.authorAkay, Abdullah Emin
dc.contributor.authorBorz, S.A.
dc.date.accessioned2021-03-20T20:27:03Z
dc.date.available2021-03-20T20:27:03Z
dc.date.issued2017
dc.departmentBTÜ, Orman Fakültesi, Orman Mühendisliği Bölümüen_US
dc.description.abstractHarvesting operations in steep terrain are particularly challenging, especially in environmentally sensitive areas and in very dense forests that are prone to more damage when using mechanized equipment. A possible approach to limit the damage is that of integrating animal and mechanical equipment. A study was carried out to see what operational variables and to what extent are they affecting the time consumption of yarding pre-bunched stems in thinning operations applied to coniferous stands. Following a time and motion study of yarding operations it was found that the extraction distance and lateral yarding distance affected the variation of yarding cycle time. Within a work cycle, load attachment and detachment accounted for almost 65%, the rest being shared by other typical cable yarding functions. The statistics and models presented in this study may be of help in production planning, research and optimization.en_US
dc.description.sponsorshipThe authors would like to thank Mr. Eng. Paul Dima for agreeing on and supporting this study. Also, the authors would like to thank the studied workers for their consent for participating in this study. This study used the infrastructure and logistics of the Department of Forest Engineering, Forest Management Planning and Terrestrial Measurements of the Faculty of Silviculture and Forest Engineering, Transilvania University of Brasov. This paper is supported by the PhD School of the Transilvania University of Brasov.en_US
dc.identifier.endpage54en_US
dc.identifier.issn2065-2135
dc.identifier.scopus2-s2.0-85033485904en_US
dc.identifier.scopusqualityQ4en_US
dc.identifier.startpage43en_US
dc.identifier.urihttps://hdl.handle.net/20.500.12885/1417
dc.identifier.volume10en_US
dc.indekslendigikaynakScopusen_US
dc.institutionauthorAkay, Abdullah Emin
dc.language.isoenen_US
dc.publisherTransilvania University of Brasoven_US
dc.relation.ispartofBulletin of the Transilvania University of Brasov, Series II: Forestry, Wood Industry, Agricultural Food Engineeringen_US
dc.relation.publicationcategoryMakale - Uluslararası Hakemli Dergi - Kurum Öğretim Elemanıen_US
dc.rightsinfo:eu-repo/semantics/openAccessen_US
dc.subjectAnimal loggingen_US
dc.subjectCable yardingen_US
dc.subjectPre-bunchingen_US
dc.subjectSteep terrainen_US
dc.subjectTimeen_US
dc.titleYarding pre-bunched stems in thinning operations: Estimates on time consumptionen_US
dc.typeArticleen_US

Dosyalar

Orijinal paket
Listeleniyor 1 - 1 / 1
Yükleniyor...
Küçük Resim
İsim:
06. Munteanu et al.pdf
Boyut:
692.32 KB
Biçim:
Adobe Portable Document Format
Açıklama:
Tam Metin / Full Text